Research Article
A Novel Excavation and Construction Method for an Extra-Long Underwater Tunnel in Soft Soils
Figure 8
Development of the vertical movements of the longitudinal DSSPs during construction. (a) On the north side of Zone #1 and (b) on the south side of Zone #1.
(a) |
(b) |