Estimation of Super High-Rise Pumping Pressure for High-Performance Concrete Based on Computational Fluid Dynamics Modeling and Situation Measurement

Table 2

The comparison for the calculated pressure value and measured one.

Pumping height (m)Plastic viscosity ()Discharge (m3/h)Calculated value (MPa)Measured value (MPa)Relative error (%)

243556516.3317.7−7.71
250556516.6913.622.69
268556116.8619−11.28
272556517.7913.630.80
277556518.016−12.75
299556118.3619−3.39
295556118.1619−4.41
299556519.271620.48
304556117.9819−5.39
546.6453021.1022.5−6.21
552.1452319.7422−10.27
556.6454524.2222.67.18
561.1452821.6222.9−5.61
565.4453021.7722.5−3.26
569.7452420.3222.9−11.25
574452118.8623.1−18.35
578.85453022.2422.9−2.87
582.15452822.3623.4−4.45