Abstract

Understanding the mechanical properties and energy response of high-porosity concrete under the cyclic loading and unloading is the foundation of road construction in sponge city. In this study, the concrete with the porosity of 15% was taken as the research object, and the cyclic loading and unloading tests on the high-porosity concrete were performed under the stress amplitude of 25 MPa, 30 MPa, and 35 MPa in the elastic stage. The effects of stress amplitude and cycle number on the mechanical characteristics and damage evolution law of concrete were obtained. The experimental results show the following. (1) With the increase of cycle number, the loading and unloading elastic modulus of concrete under different stress amplitudes first increases and then decreases; the greater the stress amplitude, the faster the growth and deceleration of the loading and unloading elastic modulus. (2) With the increase of the cycle number, the peak strain and residual plastic deformation increase. (3) The greater the stress amplitude, the higher the damage of concrete; with the increasing number of cyclic loading and unloading, the damage of concrete is enhanced gradually. When the damage variable value is 1, the relationship between the cycle number and the initial stress amplitude satisfies a negative exponential function.

1. Introduction

Sponge city construction is an important opportunity and challenge in China’s new urbanization construction, and it is also an important way to solve the water shortage, water environment deterioration, and flood disasters in the current new urbanization construction [1]. Due to the good permeability of permeable concrete, permeable concrete has been widely used in the construction of sponge cities [2]. The application of permeable concrete not only meets the needs of environmental protection but also effectively utilizes urban water resources and alleviates the urban heat island effect [1, 3].

At present, the effect of loading mode on the mechanical properties of concrete has been extensively studied [4]. Cook and Chindaprasirt [5] investigated the effect of loading history on the compressive properties of concrete. It is found that the compressive performance of concrete is slowly rising in the early stage; after reaching a certain strength (about 10% of the theoretical value), the compressive performance of concrete decreases rapidly with the occurrence of damage. Subsequently, Cook and Chindaprasirt [6] explored the effect of loading history on the tensile properties of concrete. Akutagawa et al. [7] found that the loading history on the compressive performance of concrete not only affects its compressive performance but also affects the elastic modulus and Poisson’s ratio of concrete. Through the MTS 815 program-controlled servo test system, Xing et al. [8] conducted a uniaxial compression test on concrete cylindrical specimens under cyclic loads and studied the effects of the initial load, cyclic frequency, and the increased amplitude of cyclic stress on the mechanical behavior of concrete specimens. It is concluded that under the same initial load and increased amplitude of cyclic stress, cyclic frequency has little effect on the strength of concrete. Under the same initial load and cycle frequency, the strength of the specimen decreases with the increase of the increased amplitude of cyclic stress. Under the same cycle frequency and the same increased amplitude of cyclic stress, the strength of concrete tends to decrease with the increase of initial load [9]. By using a large multifunctional dynamic and static triaxial apparatus, Hu et al. [10], Wang et al. [11], and Liang et al. [12] treated the damage characteristics as the research objective, analyzed the constitutive model of concrete under cyclic load, and then obtained the damage law. According to the research result of Song et al. [13], concrete will have much more fatigue strain under cyclic load than monotonic load. They also found that the damage accumulation caused by internal microcrack is the result of the irreversible deformation of concrete material and the change of various mechanical parameters [14]. Song et al. [13, 15] analyzed the destruction of concrete under cyclic load in the way of the hysteretic characteristics of dissipated energy. They also researched the failure mode of concrete under monotonic load and cyclic load and then found that the size and type of crack are directly related to the loading method. At the same time, the energy loss during loading increases with the increase of load level and simultaneously reaches the maximum. Ma et al. [16] studied the crushing characteristics and seepage characteristics of gangue concrete samples under different stresses and proposed a method to predict the evolution of permeability using fractal dimensions. Jiang et al. [17] compared and analyzed the fatigue damage characteristics of concrete through three types of cyclic action of concrete and evaluated the fatigue life based on the damage variables. Xiao et al. [18] established a damage accumulation model with mathematical equation and physical significance for rock under cyclic load and verified it with data.

Scholars have used different experimental methods to study the relationship between porosity and physical and mechanical properties of concrete and achieved rich results [1925]. Balshin [22] and Hasselman and Fulrath [23] investigated the influence of porosity change on compressive strength of the porous concrete through experiments and obtained the relationship between compressive strength and porosity change. Knudsen [24] conducted a series of seepage experiments to explore the influence of fluid scouring behavior on sample porosity and permeability. Ma et al. [26] explored the relationship between porosity and compressive strength of cement foamed concrete and developed a mathematical model to describe the relationship between porosity and strength of concrete. Deng and Li [27] adopted expanded polystyrene (EPS) particles with a diameter of about 1-2 mm as the approximate pore structure in concrete and obtained the compressive strength, splitting tensile strength, and static compressive elastic modulus of C15, C20, and C30 concrete with the porosity of 0, 1%, 3%, and 5%. It is reported that under the same strength grade, the compressive strength, split tensile strength, and static compressive elastic modulus of concrete decrease with the increase of porosity. Xia et al. [28] discussed the influence of porosity on the energy dissipation of artificial rock from the perspective of impact load and found that under the action of impact load, the energy dissipated by concrete increases with the increase of concrete porosity.

In the research on the mechanical properties of concrete, mechanical properties of concrete with different porosity under uniaxial compression are mainly studied, as well as the concrete test without considering the porosity factor. However, the roads of sponge cities are constructed on high-porosity permeable concrete, and vehicles have a typical cyclic loading and unloading effect on the roads. At present, there are few studies on the mechanical properties of high-porosity concrete under cyclic load [29]. To this end, the experimental method was used to analyze the effects of cyclic number, cyclic load amplitude, and other parameters on the mechanical properties and energy dissipation of high-porosity concrete in this study.

2. Test Equipment and Test Scheme

2.1. Sample Preparation

The raw materials of concrete samples in this test were cement, stone, and water. The PO 32.5 grade ordinary Portland cement was produced by Xuzhou China United Cement Corporation. The limestone gravel with the particle size of 5–13 mm was used as coarse aggregate. The apparent density of limestone gravel was 3010 Kg/m3, the content of elongated and flaky particles was 5.25%, the mud content was 0.26%, and the water content was 0.24%.

The cubic concrete samples with high porosity of P = 15% and the size of 100 mm × 100 mm × 100 mm were prepared. According to the previous studies [30], the mixed proportion of water, cement, and stone was determined. Then, concrete mixed by the mixer was injected into the mold, and the surface was smoothed after shaking by the shaking table. The concrete was cured in the curing room (temperature 20 ± 2°C) for 24–48 hours and watered every 8 hours. After that, the mold was removed, and the demoulded concrete was placed in the curing room (temperature 20 ± 2°C, humidity ≥95%) and cured for 28 days. Figure 1 shows a part of the processed concrete samples. The water saturation method was used to remove the specimens that did not meet the porosity requirement. Finally, 40 pieces of specimens were processed for the subsequent study.

2.2. Experimental Equipment

The universal testing machine of the State Key Laboratory for Geomechanics and Deep Underground Engineering of China University of Mining and Technology was used as the loading equipment in the test. This system consists of four parts: control valve system, dynamic loading system, data acquisition system, and computer control system. The data acquisition system consists of two parts. One is the displacement load acquisition system carried by the test loading equipment; the other part is the ASMB2-8 super static signal acquisition instrument. Figure 2 shows the main test instruments. During the test, horizontal and vertical strain gauges were attached to the side of the sample, as shown in Figure 2.

2.3. Test Scheme

Firstly, the uniaxial compression test of high-porosity concrete was carried out, and its full stress-strain curve was obtained, as shown in Figure 3. Secondly, the deformation process of high-porosity concrete was divided into different stages: (I) initial compaction process , (II) approximate linear elastic stage , (III) microcrack evolution stage , and (IV) failure stage .

In the test, 50%, 60%, and 70% of the peak stress of concrete under uniaxial compression, i.e., 25 MPa, 30 MPa, and 35 MPa, were selected as the stress amplitude of low cyclic loading. The three stress amplitudes were in the approximate linear elastic stage (stage II) in Figure 3. During the test, the corresponding stress amplitudes were loaded by 0.002 mm/s displacement loading and then unloaded to 5 MPa (the boundary point between compaction stage and linear elastic stage) by 0.002 mm/s displacement unloading. This process was called a cycle. A total of 60 cycles were performed under the stress amplitude of each group to analyze the influence of stress amplitude and cycle number C on the mechanical properties and damage evolution of concrete.

3. Mechanical Properties of High-Porosity Concrete under Different Stress Amplitudes in Cyclic Loading and Unloading

3.1. Variation Law of Stress-Strain Curve with Stress Amplitude

Figure 4 shows the similarities and differences of concrete stress-strain curves under cyclic loading and unloading with different stress amplitudes. With the increase of the cycle number, the peak strain and residual plastic deformation under different stress amplitudes gradually increase. However, the changes of peak strain and residual plastic deformation under different stress amplitudes are different. The greater the stress amplitude, the larger the increase of the residual plastic deformation and the peak strain. When the stress amplitude is 30 MPa and 35 MPa, the density of the stress-strain cycle curve changes from sparse to dense and then to sparse, while when the stress amplitude is 25 MPa, the density of the stress-strain cycle curve changes from sparse to dense. This is can be explained as follows. Before loading, there are original pores and cracks in the high-porosity concrete, and the concrete is more prone to deformation; under the action of the load, these pores and cracks are gradually and partially closed, leading to the denser concrete. Thus, the stress-strain cycle curve shows a process from sparse to dense. When the concrete undergoes multiple cyclic loading and unloading, internal pores of the concrete are damaged, leading to the generation of new cracks. At the same time, coupled with the development of the original cracks, the integrity of the internal structure of concrete becomes worse and the compressive capacity becomes weaker. Thus, the stress-strain cycle curve changes from dense to sparse. When the stress amplitude is 25 MPa, there is no change from dense to sparse in stress-strain cycle curves. It indicates that the internal structure of the sample is relatively complete after 60 cyclic loading and unloading cycles at the stress amplitude of 25 MPa. Besides, the concrete can generally withstand the action of multiple alternating loads if the applied load is relatively small.

3.2. Variation Law of Mechanical Properties of Concrete with Stress Amplitude

Under different loading stress amplitudes and number of cycles, the variation laws of different loading stress amplitudes and cycle number on the loading elastic modulus EF, unloading elastic modulus EC, and peak strain and residual plastic deformation (the strain corresponding to unloading to 5 MPa during unloading) of the concrete are shown in Figure 5.

After the concrete is loaded, the initial microcrack will expand. When the load is small, the length and width of the initial interface crack will increase and form a new interface crack. As long as the load does not exceed a certain value, the crack will stop expanding due to constant load or unloading. However, when cyclic loading is repeated, the crack will continue to expand and the mechanical properties of the concrete will be changed; the greater the applied load, the faster the crack propagation. Therefore, when concrete is subjected to cyclic loading, its mechanical properties will be changed accordingly.

As shown in Figures 5(a) and 5(b), the influence of stress amplitude and cycle number on loading and unloading elastic modulus can be obtained. Under the same stress amplitude, the loading elastic modulus and unloading elastic modulus first rise and then decline with the increase of cycle number. The greater the stress amplitude, the faster the rising rate and the faster the decline rate. When the stress amplitude is 25 MPa, 30 MPa, and 35 MPa, there are different cycle numbers required for reaching the peak of loading and unloading elastic modulus. The cycle numbers of 55, 35, and 15 are required for the peak of loading elastic modulus, and the cycle numbers of 50, 30, and 15 are required for the peak of unloading elastic modulus, respectively. In other words, the greater the stress amplitude, the less the cycle number required for the maximum of loading and unloading elastic modulus. When the stress amplitude is 25 MPa and 35 MPa, the maximum values of loading elastic modulus are 59.07 GPa and 58.12 GPa, respectively, and the maximum values of unloading elastic modulus are 63.71 GPa and 64.2 GPa, respectively. Therefore, the larger the stress amplitude, the smaller the maximum value of loading elastic modulus and the larger the maximum value of unloading elastic modulus.

Figures 5(c) and 5(d) show the influence of stress amplitude and cycle number on peak strain and residual plastic deformation. It can be concluded that the greater the stress amplitude, the greater the corresponding peak strain and residual plastic deformation at the same cycle number. With the increase of the cycle number, the peak strain and residual plastic deformation under the three stress amplitudes linearly increase. Under different stress amplitudes, there are different increasing rates of peak strain and residual plastic deformation with the increase of cycle number. When the stress amplitude is 35 MPa, the increasing rate of peak strain and residual plastic deformation is the largest with the increase of cycle number; when the stress amplitude is 25 MPa, the increasing rate is the smallest.

4. Damage Evolution Law of High-Porosity Concrete

4.1. Definition of Damage Variable

High-porosity concrete is an elastic-plastic material. In the process of cyclic loading and unloading, the damage evolution process of concrete is closely related to the strain amplitude of concrete and cycle number [31]. Under the same stress amplitude, the unloading process is a slow process. Only when the damage threshold of porosity accumulation is reached after a certain number of cycles, the mechanical properties of the concrete during the unloading process will be attenuated. Before attenuation, in each cycle, the strength and elastic modulus of concrete may be greater than or equal to the initial elastic modulus of concrete. At this time, if the damage of concrete is defined according to the traditional elastic modulus method, the damage variable will be negative or the damage variable will be 0.

Therefore, the previous definition of damage to elastic materials is not applicable in this study, and a new definition of damage is introduced for the elastic-plastic body. For a single cycle of concrete, the deformation modulus at the damage is

At this time, the unloading stiffness EC is expressed as follows:

The deformation modulus at the damage can be re-expressed as

Then, the damage modulus of concrete under the final cycle can be expressed aswhere and are the peak strain and residual strain and EF and EC are the loading elastic modulus and unloading elastic modulus, respectively.

Under cyclic loading, the damage variable of concrete is a function of the cycle number, stress amplitude, and strain amplitude. When analyzing the damage change of concrete, it is necessary to consider the loading mode and the cycle number of concrete. By combining the mechanical parameters of concrete under cyclic load, the internal damage of concrete can be analyzed.

4.2. Study on Damage of Concrete under Cyclic Loading and Unloading

Figure 6 shows the variation law of the damage variable of the concrete with the number of cycles under different stress amplitudes. As shown in Figure 6, the change law of concrete damage variables with the cycle number under four different stress amplitudes is mainly reflected in the following aspects: ① under the same stress amplitude, the damage of concrete gradually increases with the increase of the cycle number; ② with the same number of cycles, the damage variable of concrete under the large stress amplitude is generally greater than that under the small stress amplitude. After 5 cycles, the damage variable of concrete under the stress amplitude of 38 MPa is 0.37, while the damage variable of concrete under the stress amplitude of 25 MPa is 0.33.

The damage variable gradually increases with the increase of the cycle number, which indicates that the internal damage of concrete is a cumulative process. The increase of the cycle number leads to the gradual maturity of the development of internal cracks in concrete. Many cracks cannot be closed after unloading and develop to the surrounding space during the reloading. The larger the stress amplitude, the more obvious the effect.

The damage variable curve can be simply fitted linearly as follows:

When the damage variable value is set as 1, the number of cyclic loading required for the failure of concrete samples can be roughly estimated. Through calculation, 185 cycles of cyclic loading are required for the sample failure under the stress amplitude of 25 MPa, 166 cycles under 30 MPa, 142 cycles under 35 MPa, and 131 cycles under 38 MPa.

4.3. Service Life Prediction of High-Porosity Concrete under Cyclic Loading and Unloading

Due to the limitation of test conditions and the long cycle time of cyclic loading and unloading, the relationship between the cycle number and damage variables can be fitted through effective test data, and the cycle number can be obtained when the damage variable value of the sample is 1 under different stress amplitudes. When the damage variable of cyclic loading and unloading is set as 1, the cycle number under the stress amplitudes of 25 MPa and 30 MPa is obtained through calculation of equations (5)–(7). In this way, the relationship with the stress amplitude can be established by the number of cycles when the damage variable is 1. To intuitively clarify the relationship between the damage variable of concrete and the initially applied uniaxial stress, the relationship curve between the cycle number of concrete and the stress amplitude is shown in Figure 7.

As can be seen from Figure 6, with the gradual increase of the initially applied stress, the cycle number of concrete gradually decreases. By linear fitting the initially applied stress and the cycle number, the variation law can be obtained as follows:

When the stress value of 54 MPa is substituted into equation (8), it is found that the cycle number is less than 2, which is consistent with the test results under the uniaxial compression.

5. Conclusions

In this study, the universal testing machine was used to load and unload the concrete samples with the porosity of 15% under different stress amplitudes in the displacement loading mode. The effects of the changes of stress amplitude and cycle number on the mechanical properties and energy dissipation of high-porosity concrete were analyzed. The main conclusions are as follows:(1)A total of 60 cyclic loading and unloading tests are carried out under three stress amplitudes, and the variation law of the cyclic loading and unloading stress-strain curves of concrete is obtained. The stress-strain curves of concrete under the stress amplitude of 25 MPa are changed from sparse to dense; the stress-strain curves of concrete under stress amplitudes of 30 MPa and 35 MPa are changed from sparse to dense and then sparse.(2)The influence of stress amplitude variation on the mechanical properties of concrete is mainly reflected in the following aspects: under the three stress amplitudes, the loading and unloading elastic modulus of concrete first increases and then decreases, and the greater the stress amplitude, the faster the growth and deceleration of elastic modulus; the peak strain and residual plastic deformation increase gradually with the increase of the cycle number, and the greater the stress amplitude, the greater the peak strain and residual plastic deformation at the same cycle number; the greater the stress amplitude, the greater the dissipation energy of concrete under the same cycle number, and the variation law of concrete under the three stress amplitudes is roughly the same.(3)The greater the stress amplitude, the higher the damage of concrete. With the increase of cyclic loading and unloading times, the damage of concrete becomes larger and larger. When the damage variable value is 1, the relationship between the cycle number and the initial stress amplitude satisfies a negative exponential function. When the stress amplitude is 54 MPa, the number of concrete cycles is 1.

Data Availability

The data used to support the findings of this study are included within the article.

Conflicts of Interest

The authors declare that they have no conflicts of interest.

Acknowledgments

This research was funded by the National Key Research and Development Program of China (2019YFC1904302) and China Energy Group Science and Technology Program (GJNY-20-111).