Research Article
Study on the Applicability of an Improved Pile-Beam-Arch Method of Metro Station Construction in the Upper-Soft and Lower-Hard Stratum
Figure 12
The construction process of arches. (a) Stage 5-1. (b) Stage 5-2. (c) Stage 5-3. (d) Stage 5-4.
| (a) |
| (b) |
| (c) |
| (d) |