Research Article
Deformation Responses and Mechanical Mechanism of Existing Tunnel due to New Building Construction
| Step | Name of the condition |
| 1 | Read the initial value | 2 | Dewater | 3 | Excavate to −133 mm depth | 4 | Tension the first layer of anchor cable | 5 | Excavate to −266 mm depth | 6 | Excavate to −400 mm depth | 7 | Tension the second layer of anchor cable | 8 | Excavate to −533 mm depth | 9 | Excavate to −666 mm depth | 10 | Tension the third layer of anchor cable | 11 | Excavate to −800 mm depth | 12 | Excavate to −933 mm depth | 13 | Excavate to −1000 mm depth | 14 | Stay stationary after excavation completion | 15 | Load the mat foundation | 16 | Load the first layer of weights | 17 | Load the second layer of weights | 18 | Load the third layer of weights | 19 | Load the fourth layer of weights | 20 | Load the fifth layer of weights | 21 | Load the sixth layer of weights | 22 | Load the seventh layer of weights | 23 | Stay stationary after load completion | 24 | Groundwater recover to the initial level | 25 | Stay stationary after groundwater recover |
|
|