Deformation Responses and Mechanical Mechanism of Existing Tunnel due to New Building Construction
| | Step | Name of the condition |
| | 1 | Read the initial value | | 2 | Dewater | | 3 | Excavate to −133 mm depth | | 4 | Tension the first layer of anchor cable | | 5 | Excavate to −266 mm depth | | 6 | Excavate to −400 mm depth | | 7 | Tension the second layer of anchor cable | | 8 | Excavate to −533 mm depth | | 9 | Excavate to −666 mm depth | | 10 | Tension the third layer of anchor cable | | 11 | Excavate to −800 mm depth | | 12 | Excavate to −933 mm depth | | 13 | Excavate to −1000 mm depth | | 14 | Stay stationary after excavation completion | | 15 | Load the mat foundation | | 16 | Load the first layer of weights | | 17 | Load the second layer of weights | | 18 | Load the third layer of weights | | 19 | Load the fourth layer of weights | | 20 | Load the fifth layer of weights | | 21 | Load the sixth layer of weights | | 22 | Load the seventh layer of weights | | 23 | Stay stationary after load completion | | 24 | Groundwater recover to the initial level | | 25 | Stay stationary after groundwater recover |
|
|