Simplified construction schedule for pits C1 and D.
| | ā | Step | Condition | Depth (m) |
| | Pit C1 | 1 | Surface soil removal | 0.5 | | 2 | First floor excavation and strut installation | 4.7 | | 3 | Second floor excavation and strut installation | 4.3 | | 4 | Third floor excavation and strut installation | 4.35 | | ā | Surface soil removal | 0.5 |
| | Pit D | 1 | Surface soil removal | 0.5 | | 2 | First floor excavation and strut installation | 4.1 | | 3 | Second floor excavation and strut installation | 4.0 | | 4 | Third floor excavation and strut installation | 3.8 | | 5 | Fourth floor excavation and strut installation | 4.5 |
|
|