Research Article

A New Method for Reducing Collapsibility of Loess Foundation with Thicker Deposit: The Borehole Preimmersion Method

Figure 10

(a) Layout of water injection holes (unit: mm and scale: 1 : 100). (b) Immersion field.
(a)
(b)