Research Article

A New Method for Reducing Collapsibility of Loess Foundation with Thicker Deposit: The Borehole Preimmersion Method

Figure 2

(a) Seepage length in different directions during period . (b) Calculation diagram of soaked soil passing through the center of the circle.
(a)
(b)