Research Article
A New Method for Reducing Collapsibility of Loess Foundation with Thicker Deposit: The Borehole Preimmersion Method
Figure 3
(a) Vertical profile of the soaked soil volume when passed through two water injection holes to soak. (b) Horizontal section at the maximum percolation radius of the soaked soil volume.
(a) |
(b) |