Research Article
A New Method for Reducing Collapsibility of Loess Foundation with Thicker Deposit: The Borehole Preimmersion Method
Figure 8
(a) Change curve of infiltration depth with immersion time. (b) Infiltration radius change curve with immersion time.
| (a) |
| (b) |