Optimization of Flow Shop Scheduling in Precast Concrete Component Production via Mixed-Integer Linear Programming
Table 6
Overtime plan for scheme (1).
| | Component production sequence | Process operation time (h) | | Mold assembling | Reinforcement setting | Concrete casting | Mold removal | Finishing/repairing |
| | 1 | 0 | 0 | 0 | 0 | 0 | | 2 | 0 | 0 | 0 | 0 | 0 | | 3 | 0 | 0 | 0 | 0 | 0 | | 4 | 0 | 0 | 0 | 0 | 0 | | 5 | 0 | 0 | 1 | 0 | 0 | | 6 | 0 | 1 | 2.5 | 0 | 0.8 | | 7 | 0 | 1.8 | 3.7 | 0.7 | 0 | | 8 | 0 | 0 | 0 | 0 | 0 | | 9 | 0 | 0 | 0 | 0 | 0 | | 10 | 0 | 0 | 0 | 0 | 0 | | Overtime of each process (h) | 0 | 2.8 | 7.2 | 0.7 | 0.8 | | Total overtime (h) | 11.5 |
|
|