Study on Anchor Cable instead of Single Hydraulic Prop Support in Advance Support of Deep Roadway
Table 3
Data of borehole peeping instrument.
| | Fracture development area (m) | Separation zone (m) | Crushing zone (m) |
| 1# | 0.1–0.4 | 0.8–1.0 | 0.5–0.8 | 1.9–2.2 | 1.9–2.2 | 2# | 0.8–1.3 | 0.4–0.8 | 0.8–1.8 | 3# | 0.1–1.0 | 1.5–1.6 | 1.0–1.4 | 2.7–3.0 | 4# | 0.1–0.5 | 0.7–1.0 | 1.5–2.2 | 5# | 0.1–1.0 | 1.6–1.8 | 0.9–1.1 | 1.4–2.7 | 6# | 0.1–0.3 | 0.7–1.2 | 0.9–1.1 | 1.4–2.7 | 7# | 0.1–0.7 | 1.7–1.9 | 0.3–1.4 | 0.9–1.4 | 8# | 0.3–0.7 | 2.7–3.0 | 1.6–3.0 | 9# | 0.1–0.3 | \ | 1.7–1.8 | 2.6–3.0 |
|
|