Research Article
Study on the Static Performance of Prefabricated UHPC-Steel Epoxy Bonding Interface
Figure 2
Loading scheme of specimen PS-E, specimen PT-E, and specimen ST-E. (a) Direct shear test. (b) Tensile test. (c) Tensile-shear test.
(a) |
(b) |
(c) |