Research Article

Study on the Static Performance of Prefabricated UHPC-Steel Epoxy Bonding Interface

Figure 2

Loading scheme of specimen PS-E, specimen PT-E, and specimen ST-E. (a) Direct shear test. (b) Tensile test. (c) Tensile-shear test.
(a)
(b)
(c)