Research Article
Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6
Figure 12
Cloud diagram of plastic deformation of the newly built tunnel. (a) Excavation program I. (b) Excavation program II.
(a) |
(b) |