Research Article

Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6

Figure 14

Cloud diagram of horizontal deformation of the newly built tunnel segment. (a) Excavation program I. (b) Excavation program II.
(a)
(b)