Research Article

Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6

Figure 15

Development trend of settlement at segment top and segment bottom of the existing tunnel with increasing excavation step. (a) Settlement of segment top. (b) Settlement of segment bottom.
(a)
(b)