Research Article
Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6
Figure 16
Monitoring of settlement and horizontal deformation of the existing tunnel. (a) Monitoring site. (b) Layout of measuring points.
| (a) |
| (b) |