Research Article
Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6
Figure 18
Time-history curves of horizontal deformation in characteristics sections of the existing tunnel. (a) DK25 + 870 section. (b) DK25 + 880 section.
| (a) |
| (b) |