Research Article

Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6

Figure 18

Time-history curves of horizontal deformation in characteristics sections of the existing tunnel. (a) DK25 + 870 section. (b) DK25 + 880 section.
(a)
(b)