Research Article

Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6

Figure 5

Cloud diagram of vertical settlement of the existing tunnel lining. (a) Excavation program I. (b) Excavation program II.
(a)
(b)