Research Article

Stability Analysis of TBM Tunnel Undercrossing Existing High-Speed Railway Tunnel: A Case Study from Yangtaishan Tunnel of Shenzhen Metro Line 6

Table 1

Physical and mechanical parameters of materials.

Material typesγ (kN·m−3)E (MPa)μφ (°)c (MPa)

GraniteCompletely weathered region ①9.204.900.40230.02
Highly weathered region ②-111.50500.33300.07
Highly weathered region ②-215.601600.31420.10
Moderately weathered region ③20.1050000.254520
Week weathered region ④26.80200000.225555

Fault fracture zone171500.28370.09

Lining25210000.26

Segment25270000.20

TBM shield782500000.20