Collaborative Mining Sequence Optimization for Multiple Stopes under Intensive Mining
Table 2
Calculation results of the six mining sequence schemes.
| Scheme | D (cm) | TS (MPa) | CS (MPa) | SS (MPa) | SF (m³) | TF (m³) | TSF (m³) | TTF (m³) |
| 1 | 9.39 | 2.21 | 52.67 | 19.98 | 432578 | 264.57 | 10105900 | 380182 | 2 | 9.56 | 2.24 | 50.32 | 18.35 | 621531 | 390.88 | 10024000 | 397980 | 3 | 9.40 | 2.21 | 50.44 | 19.24 | 459187 | 375.76 | 10029400 | 385725 | 4 | 9.55 | 2.23 | 50.33 | 18.26 | 525976 | 240.74 | 10034300 | 395019 | 5 | 8.44 | 2.25 | 50.48 | 18.5 | 404996 | 272.14 | 9786510 | 349378 | 6 | 10.3 | 2.39 | 56.71 | 21.19 | 473828 | 175.29 | 8794870 | 351962 |
|
|