Research Article

Collaborative Mining Sequence Optimization for Multiple Stopes under Intensive Mining

Table 4

Score of the basic elements of the six schemes.

SchemeD (cm)T (MPa)C (MPa)S (MPa)SF (m³)TF (m³)TSF (m³)TTF (m³)Dispersion

10.1660.1630.1690.1730.1480.1540.1720.1680.119
20.1690.1660.1620.1590.2130.2270.1710.1760.198
30.1660.1630.1620.1670.1570.2190.1710.1710.165
40.1690.1650.1620.1580.1800.1400.1710.1750.176
50.1490.1660.1620.1600.1390.1580.1670.1550.171
60.1820.1770.1820.1830.1620.1020.1500.1560.171