Research Article
Formation Mechanism and the Height of the Water-Conducting Fractured Zone Induced by Middle Deep Coal Seam Mining in a Sandy Region: A Case Study from the Xiaobaodang Coal Mine
Figure 6
Water-conducting fractured zone development patterns using the similar simulation: (a) advanced 75 m, (b) advanced 87.5 m, (c) advanced 125 m, (d) advanced 150 m, (e) advanced 175 m, and (f) advanced 350 m.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |