Research Article

Investigation of the Optimization of Unloading Mining Scheme in Large Deep Deposit Based on Vague Set Theory and Its Application

Table 4

Normalization of the economic indicators.

SchemeProduction capacity (t/d)Cost (Yuan/t)Ratio of mined tonnage to development (m/kt)

I0.890.290.10
II0.540.470.10
III0.101.000.40
IV1.000.100.61