Research Article
Numerical Analyses on Deformation and Failure Characteristics of Surrounding Rock of Gob-Side Entry Retention by Roof Cutting
Table 1
The difference of gob-side entry retention by roof cutting and by packing.
| | Process | Gob-side entry retention by roof cutting | Gob-side entry retention by packing |
| | ① | Dig out a roadway | Dig out two roadways in advance | | ② | Dig out the open-off cut | Dig out the open-off cut | | ③ | Working face mining | Working face mining | | ④ | Dig out the other roadway space at the same time | Fill and retain roadway behind the working face | | ⑤ | The roof was cut and the roadway was retained behind the working face | Dig out the other roadway | | ⑥ | Dig out the other open-off cut | Dig out the other open-off cut | | ⑦ | The other working face mining | The other working face mining | | ⑧ | Dig out the other roadway space at the same time | — |
|
|