Research Article
Modification of Peck Formula to Predict Ground Surface Settlement of Twin Tunnels in Low Permeability Soil
Table 3
Parameters of the simulation in Zizhi Tunnel.
| Project | (cm/s) | (mm) | (mm) | (mm) | (mm) | (m) | (m) | (m) | (m) |
| S6 section | 6 × 10−6 | −48.19 | −52.62 | −43.65 | −53.43 | 17.18 | 28.22 | 11.33 | 119.39 | S12 section | 6 × 10−6 | −24.12 | −23.87 | −25.98 | −24.12 | 16.60 | 21.22 | 20.01 | 33.80 | S18 section | 6 × 10−6 | −16.87 | −14.47 | −17.74 | −15.09 | 26.32 | 26.13 | 10.89 | 60.67 | S24 section | 6 × 10−6 | −22.52 | −20.74 | −5.83 | −23.02 | 44.65 | 10.52 | 45.87 | 90.32 |
|
|