Research Article

Modification of Peck Formula to Predict Ground Surface Settlement of Twin Tunnels in Low Permeability Soil

Table 3

Parameters of the simulation in Zizhi Tunnel.

Project (cm/s) (mm) (mm) (mm) (mm) (m) (m) (m) (m)

S6 section6 × 10−6−48.19−52.62−43.65−53.4317.1828.2211.33119.39
S12 section6 × 10−6−24.12−23.87−25.98−24.1216.6021.2220.0133.80
S18 section6 × 10−6−16.87−14.47−17.74−15.0926.3226.1310.8960.67
S24 section6 × 10−6−22.52−20.74−5.83−23.0244.6510.5245.8790.32