Research Article
Modification of Peck Formula to Predict Ground Surface Settlement of Twin Tunnels in Low Permeability Soil
Table 4
Parameters of the simulation in Nanjing Metro and Singapore MRT.
| Project | (cm/s) | (mm) | (mm) | (mm) | (mm) | (m) | (m) | (m) | (m) |
| Nanjing Metro | 6 × 10−4 | −13.88 | −13.44 | −16.85 | −17.54 | 6.73 | 6.35 | 10.12 | 47.22 | Singapore MRT | 7 × 10−7 | −39.44 | −28.89 | −58.08 | −56.50 | 14.70 | 30.14 | 19.77 | 66.95 |
|
|