Research Article

Modification of Peck Formula to Predict Ground Surface Settlement of Twin Tunnels in Low Permeability Soil

Table 4

Parameters of the simulation in Nanjing Metro and Singapore MRT.

Project (cm/s) (mm) (mm) (mm) (mm) (m) (m) (m) (m)

Nanjing Metro6 × 10−4−13.88−13.44−16.85−17.546.736.3510.1247.22
Singapore MRT7 × 10−7−39.44−28.89−58.08−56.5014.7030.1419.7766.95