Research Article
System Hazard Analysis of Tower Crane in Different Phases on Construction Site
Table 10
Hazards of system interactions.
| |||||||||||||||||||||||||||||||||||||
Note: A0-Preparation for installation, A1-Installation, A2-Usage, A3-Climbing, A4-Dismantling, as in Figure 3. |
| |||||||||||||||||||||||||||||||||||||
Note: A0-Preparation for installation, A1-Installation, A2-Usage, A3-Climbing, A4-Dismantling, as in Figure 3. |