Research Article
System Hazard Analysis of Tower Crane in Different Phases on Construction Site
Table 2
Features of tower crane phases.
| Phase | Task | Personnel | Equipment |
| Installation | The workers assemble the components to install a tower crane. | Installers, operator, rigger, signalman, supervisor, and manager | Truck crane and other tower cranes | Usage | The workers use a tower crane to lift materials. | Operator, rigger, and signalman | Tower crane | Climbing | The workers install a subassembly of the tower crane mast to add the height of the tower crane. | Installers, operator, rigger, signalman, supervisor, and manager | Truck crane and other tower cranes | Dismantling | The workers dismantle the tower crane to components. | Installers, operator, rigger, signalman, supervisor, and manager | Truck crane and other tower cranes |
|
|