Research Article

System Hazard Analysis of Tower Crane in Different Phases on Construction Site

Table 4

Component failure of installation phase.

ComponentHazard

Tower crane and its componentsHIP1 defective foundation of tower crane
HIP2 unstable integral structure of tower crane
HIP3 nonconforming member of tower crane
HIP4 deletion of tower crane member
HIP5 unstable fastenings

Manager/supervisor/workerHIP6 lack of staff
HIP7 lack of ability or qualification
HIP8 mental and physical distress
HIP9 weak safety concept
HIP10 failure to wear protective equipment as required

DocumentHIP11 lack of document
HIP12 incomplete scheme
HIP13 design error