Component failure of usage phase.
| | Component | Unsafe state |
| | Lifting system | HUP1 defective foundation of tower crane | | HUP2 unstable integral structure of tower crane | | HUP3 nonconforming member of tower crane | | HUP4 deletion of tower crane member | | HUP5 unstable fastenings | | HUP6 tower crane over the service life | | HUP7 tower crane operating system malfunction | | HUP8 materials too large or too heavy |
| | Monitoring system of tower crane | HUP9 lack of monitoring system | | HUP10 sensors failure |
| | Security system of tower crane | HUP11 lack of security system | | HUP12 security device failure |
| | Signalman/operator/rigger | HUP13 lack of staff | | HUP14 without ability or qualification | | HUP15 mental and physical distress | | HUP16 weak safety concept | | HUP17 failure to wear protective equipment as required |
|
|