System Hazard Analysis of Tower Crane in Different Phases on Construction Site
Table 7
Component failure of usage phase.
| Component | Unsafe state |
| Lifting system | HUP1 defective foundation of tower crane | HUP2 unstable integral structure of tower crane | HUP3 nonconforming member of tower crane | HUP4 deletion of tower crane member | HUP5 unstable fastenings | HUP6 tower crane over the service life | HUP7 tower crane operating system malfunction | HUP8 materials too large or too heavy |
| Monitoring system of tower crane | HUP9 lack of monitoring system | HUP10 sensors failure |
| Security system of tower crane | HUP11 lack of security system | HUP12 security device failure |
| Signalman/operator/rigger | HUP13 lack of staff | HUP14 without ability or qualification | HUP15 mental and physical distress | HUP16 weak safety concept | HUP17 failure to wear protective equipment as required |
|
|