Research Article

System Hazard Analysis of Tower Crane in Different Phases on Construction Site

Table 7

Component failure of usage phase.

ComponentUnsafe state

Lifting systemHUP1 defective foundation of tower crane
HUP2 unstable integral structure of tower crane
HUP3 nonconforming member of tower crane
HUP4 deletion of tower crane member
HUP5 unstable fastenings
HUP6 tower crane over the service life
HUP7 tower crane operating system malfunction
HUP8 materials too large or too heavy

Monitoring system of tower craneHUP9 lack of monitoring system
HUP10 sensors failure

Security system of tower craneHUP11 lack of security system
HUP12 security device failure

Signalman/operator/riggerHUP13 lack of staff
HUP14 without ability or qualification
HUP15 mental and physical distress
HUP16 weak safety concept
HUP17 failure to wear protective equipment as required