Research Article
Health Monitoring System with Hybrid Laser Sensor Networks and Cloud Computing for Subway Tunnels
Table 5
Measured value of the cable convergence instrument.
| Loading method | Convergence meter data (m) | No. 2 | No. 4 | No. 6 |
| Initial state | 0.996 | 0.996 | 0.881 | Loading point 1 50 N | 0.993 | 0.992 | 0.870 | Loading point 1 100 N | 0.991 | 0.991 | 0.863 | Loading point 2 50 N | 0.990 | 0.995 | 0.878 | Loading point 2 100 N | 0.985 | 0.994 | 0.875 | Loading point 3 50 N | 0.995 | 0.990 | 0.875 | Loading point 3 100 N | 0.993 | 0.986 | 0.871 |
|
|