Research Article
Design and Mechanical Properties of Steel-UHPC Lightweight Composite Decks
Figure 25
Construction procedure of LWCD: (a) bridge deck cleaning and rust removal; (b) shear stud welding; (c) antirust coating; (d) placing rebar net; (e) UHPC casting; (f) UHPC vibration and leveling; (g) steam curing; (h) UHPC surface roughening; (i) asphalt layer paving.
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |
| (f) |
| (g) |
| (h) |
| (i) |