Research Article

Design and Mechanical Properties of Steel-UHPC Lightweight Composite Decks

Figure 25

Construction procedure of LWCD: (a) bridge deck cleaning and rust removal; (b) shear stud welding; (c) antirust coating; (d) placing rebar net; (e) UHPC casting; (f) UHPC vibration and leveling; (g) steam curing; (h) UHPC surface roughening; (i) asphalt layer paving.
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)