Research Article
Design and Mechanical Properties of Steel-UHPC Lightweight Composite Decks
Figure 25
Construction procedure of LWCD: (a) bridge deck cleaning and rust removal; (b) shear stud welding; (c) antirust coating; (d) placing rebar net; (e) UHPC casting; (f) UHPC vibration and leveling; (g) steam curing; (h) UHPC surface roughening; (i) asphalt layer paving.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |
(g) |
(h) |
(i) |