Research Article

Case Study on the Stability Control of Broken Surrounding Rock in Roadway Excavation on the Edge of a Collapsed Stope Area

Table 3

Statistical results of the RQD values after grouting.

Drill numberHole depth (m)Inclination (°)Elevation (m)Coordinate lineRQD value (%)

ZK125.028−240.0Y468.92
ZK235.00−240.0Y473.51
ZK334.0−29−240.0Y471.29
ZK443.0−64−240.0Y474.83