Research Article

The Ground Settlement and the Existing Pipeline Response Induced by the Nonsynchronous Construction of a Twin-Tunnel

Figure 8

The settlement during ST construction with different spaces. (a) Ground surface settlement. (b) Pipeline construction.
(a)
(b)