Research Article
The Ground Settlement and the Existing Pipeline Response Induced by the Nonsynchronous Construction of a Twin-Tunnel
Figure 8
The settlement during ST construction with different spaces. (a) Ground surface settlement. (b) Pipeline construction.
(a) |
(b) |