Research Article
The Ground Settlement and the Existing Pipeline Response Induced by the Nonsynchronous Construction of a Twin-Tunnel
Figure 9
The settlement during the ST construction with different relative stiffnesses. (a) Ground surface settlement. (b) Pipeline construction.
(a) |
(b) |