The Ground Settlement and the Existing Pipeline Response Induced by the Nonsynchronous Construction of a Twin-Tunnel
Table 3
Settlements of the ground surface and the pipeline with different spaces.
| | 
 |  |  | Settlement range width (m) | Maximum settlement (mm) | Maximum settlement location (m) | Settlement curve shape |  | Surface | Pipeline | Surface | Pipeline | Surface | Pipeline | Surface | Pipeline |  | 
 |  |  | 60 | 52 | −13.0 | −10.5 | x = 0 | x = 0 | V | V |  |  | 65 | 54 | −12.6 | −10.3 | x = 4 | x = 0 | U | V |  |  | 68 | 58 | −12.3 | −9.7 | x = 6 | x = 1 | U | U |  |  | 72 | 62 | −11.4(−9.9) | −9.0 | x = 8(−8) | x = 6 | W | U |  |  | 73 | 66 | −11.1(−9.6) | −8.7 (−8.1) | x = 10(−10) | x = 8(−8) | W | W |  | 
 | 
 | 
| Note: there were two maximum settlements in the W-shape, and the other maximum settlement was in the bracket.
 |