The Ground Settlement and the Existing Pipeline Response Induced by the Nonsynchronous Construction of a Twin-Tunnel

Table 4

Settlements of ground surface and the pipeline with different rigidities.

Material (GPa) (m)Surface settlementPipeline settlement

PVC2.580.4WW
Concrete2591.9WU
Cast iron150116.6WV
Steel200128.8UV