Research Article
The Ground Settlement and the Existing Pipeline Response Induced by the Nonsynchronous Construction of a Twin-Tunnel
Table 5
Settlement curve shapes for the ground surface and the pipeline.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||
Note: the curve shape of the pipeline settlement is in the bracket. |