Research Article

Field Investigation of Blasting-Induced Vibration in Concrete Linings during Expansion of Old Highway Tunnel

Table 1

Measured PPVs in this case history.

Test numberTNT weight per delay (kg)Distance to blasting source (m)PPV of new concrete lining (cm/s)Distance to blasting source (m)PPV of the old concrete lining (cm/s)
VXVYVZVXVYVZ

150.4R2 = 20.37.2586.5016.647R3 = 29.64.5726.8755.006
R1 = 42.72.9042.2061.324R4 = 110.80.1970.2800.384

227.3R2 = 19.76.4655.5354.943R3 = 20.05.7018.2465.476
R1 = 52.61.3460.6401.674R4 = 74.20.3751.1651.211

331.2R2 = 22.74.1213.1943.030R3 = 40.43.3073.6412.741
R1 = 44.01.1221.0671.846R4 = 95.70.4451.2650.915

427.3R2 = 31.62.1002.9112.120R3 = 50.81.8652.2731.978
R1 = 98.00.5050.1940.178R4 = 70.91.9961.9971.044

531.2R2 = 48.91.4741.8260.807R3 = 37.23.6534.9192.007
R1 = 109.50.1700.1700.242R4 = 70.80.4031.8241.189

627.3R2 = 29.93.6172.6541.637R3 = 42.41.2792.2891.686
R1 = 117.20.1800.1370.378R4 = 101.50.3590.8040.840

731.2R2 = 26.54.1812.2093.261R3 = 55.31.6662.8511.798
R1 = 71.30.7900.2890.256R4 = 135.20.4060.4880.703

827.3R2 = 36.21.2722.1672.122R3 = 44.80.9102.5411.345
R1 = 79.20.6490.2920.323R4 = 156.60.4220.6580.256

931.2R2 = 28.41.8402.4921.715R3 = 87.00.8400.9881.697
R1 = 78.60.2940.6930.867R4 = 114.20.2060.7400.193

1027.3R2 = 42.91.6732.1950.730R3 = 98.10.6860.2160.363
R1 = 140.40.1590.0970.409R4 = 120.40.5450.4520.938