Research Article

Support Measures to Prevent the Deformation and Failure of a Carbonaceous Mudstone Tunnel

Figure 14

New longitudinal connection system: (a) schematic diagram of the new longitudinal connection system; (b) three-dimensional drawing of the new longitudinal connection system; (c) site assembly photos of the new longitudinal connection system.
(a)
(b)
(c)