Research Article
Centrifuge Model Test on the Settlement of Valley-Type Loess Filled after Construction and Subjected to Rainfall Infiltration
Figure 4
The preparation of the loess filling model in a valley: (a) filling process; (b) scratching process; (c) completed model; (d) model installation.
(a) |
(b) |
(c) |
(d) |