Research Article
Risk Analysis of Tunnel Construction Scheme Change based on Field Monitoring and Numerical Analysis
Figure 3
Power line status in construction section. (a) Communication lines. (b) Overhead status of communication lines. (c) Household line.
| (a) |
| (b) |
| (c) |