Research Article
Risk Analysis of Tunnel Construction Scheme Change based on Field Monitoring and Numerical Analysis
Figure 3
Power line status in construction section. (a) Communication lines. (b) Overhead status of communication lines. (c) Household line.
(a) |
(b) |
(c) |