Risk Analysis of Tunnel Construction Scheme Change based on Field Monitoring and Numerical Analysis

Table 1

Material parameters of the model.

MaterialE (MPa)μγ (kN·m3)C (MPa)Φ (°)

Miscellaneous fill150.3915.70.0112
Loess-like soil290.3017.80.01721
The pebble2500.2221020
Sandstone57.50.2421.20.0325
Advance catheter20 × 1040.2578.50.225
Big pipe shed18 × 1040.2578.5
Concrete primary support1 × 1040.2525
Secondary lining3 × 1040.2025