Research Article
Risk Analysis of Tunnel Construction Scheme Change based on Field Monitoring and Numerical Analysis
Table 1
Material parameters of the model.
| Material | E (MPa) | μ | γ (kN·m3) | C (MPa) | Φ (°) |
| Miscellaneous fill | 15 | 0.39 | 15.7 | 0.01 | 12 | Loess-like soil | 29 | 0.30 | 17.8 | 0.017 | 21 | The pebble | 250 | 0.22 | 21 | 0 | 20 | Sandstone | 57.5 | 0.24 | 21.2 | 0.03 | 25 | Advance catheter | 20 × 104 | 0.25 | 78.5 | 0.2 | 25 | Big pipe shed | 18 × 104 | 0.25 | 78.5 | — | — | Concrete primary support | 1 × 104 | 0.25 | 25 | — | — | Secondary lining | 3 × 104 | 0.20 | 25 | — | — |
|
|