Research Article
Analysis of Ground Movement during Large-Scale Pipe Roof Installation and Artificial Ground Freezing of Gongbei Tunnel
Figure 9
Calculated values of i, k, smax, and η at the end of each pipe jacking. (a) Settlement trough width coefficient i. (b) Settlement trough width parameter k. (c) Maximum settlement Smax. (d) Ground loss ratio η.
(a) |
(b) |
(c) |
(d) |