Research Article

3D Numerical Simulation of Landslides for the Full High Waste Dump Using SPH Method

Figure 15

Typical monitoring quantities. (a) Displacement (U1) time curve at the 5 positions on the slope. (b) Displacement (U magnitude) time curve at the 5 positions on the slope. (c) Displacement in the vertical axis at the middle slope. (d) Displacement in the vertical axis at the slope shoulder. (e) Velocity-time curve at the 5 positions on the slope. (f) Energy-time curve.
(a)
(b)
(c)
(d)
(e)
(f)