Research Article
3D Numerical Simulation of Landslides for the Full High Waste Dump Using SPH Method
Figure 15
Typical monitoring quantities. (a) Displacement (U1) time curve at the 5 positions on the slope. (b) Displacement (U magnitude) time curve at the 5 positions on the slope. (c) Displacement in the vertical axis at the middle slope. (d) Displacement in the vertical axis at the slope shoulder. (e) Velocity-time curve at the 5 positions on the slope. (f) Energy-time curve.
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |
| (f) |