Research Article

Design and Application of Risk Early Warning System for Subway Station Construction Based on Building Information Modeling Real-Time Model

Figure 7

Three-dimensional display of real-time early warning of Xiangjiang New Town Station. (a) Temporary engineering. (b) Enclosure structure. (c) Excavation and support of foundation pit. (d) Main structure of station. (e) Display of monitoring points.
(a)
(b)
(c)
(d)
(e)