Design and Application of Risk Early Warning System for Subway Station Construction Based on Building Information Modeling Real-Time Model

Table 2

Layout of surveying points for monitoring project.

ItemsMonitoring rangeLayout and spacing of surveying pointsAccuracy

Subsidence1–3 times of the ground around the foundation pit and soil in the depth of the foundation pit1 every 15–20 m along the longitudinal direction of the station0.3 mm
Horizontal displacement and settlement of wall topUpper of continuous wall1 every 15–20 m along the longitudinal direction of the station1.5 mm
Wall deformationWithin the enclosure20 m spacing and 0.5 m spacing in the same hole in the vertical direction1.0 mm
Axial force for support1/3 of the steel support between two points at the endSet for each layer at 30% of support, at least 3≤0.5% (F.S)
Groundwater levelSurrounding of the foundation pit and objects to be protectedLayout in 20–50 m spacing to monitor the section10 mm
Settlement and horizontal displacement of surrounding buildingsBuildings (structures) to be protectedFour corners of a building, every 10–15 m along the outer wall1.0 mm
Settlement and displacement of underground pipelineImportant municipal pipelines around the foundation pit, such as power tunnel, gas pipe, and water supply pipe5–10 m spacing0.5 mm
Soil pressureWithin the enclosure20 m spacing≤0.5% (F.S)
Observation of building cracksRelated building (structures)It depends0.1 mm