Research Article

Optimization Effects of Load Reduction for Earth Pressure on High-Filled Cut-and-Cover Tunnels Using the Discrete Element Method

Table 1

Test schemes design.

CasesThe parametersWorking conditions

C1Cross section optimization coefficient0 (rectangle)0.40.71.0āˆž (circle)
C2EPS density (kg/m3)12152030-
C3EPS laying position (m)00.020.050.08-
C4Concrete wedges height (m)0.200.260.320.38-
C5Concrete wedges width (m)0.120.170.22--