Research Article
Research on Visual Management Technology of Tunnel Construction Process Based on BIM Technology
| Specialty | Problems |
| Comparison between civil engineering model and drawing | There will be overlaps and gaps between sprayed arch walls | There will be overlaps and gaps between arch wall linings | 3# plug wall of left line and sprayed arch wall cannot be closed | There will be overlaps and gaps between invert arch linings | There will be overlaps and gaps between shotcrete linings | 3# plug wall of left line and arch wall lining cannot be closed | 3# plug wall of left line and invert arch lining cannot be closed | There is a gap between tunnel pipe sections, which cannot be closed | Overlaps and gaps will be formed between inverted arch filling |
|
|